Free LEED-AP-BD-C Exam Braindumps (page: 17)

Page 17 of 78

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental
Quality Strategies, where would CO2 monitors need to be located?

  1. In each occupied space
  2. In each densely occupied space
  3. In each occupied space and outdoors
  4. In each occupied space over 500 ft2 (46 m2)

Answer(s): B

Explanation:

According to the LEED v4 Reference Guide for Building Design and Construction, the Carbon Dioxide Monitoring strategy requires CO2 monitors to be located in each densely occupied space, which is defined as a space with a design occupant density of 25 people or more per 1,000 square feet (93 square meters). This strategy is intended to provide feedback on ventilation system performance and indoor air quality12


Reference:

1: LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Enhanced Indoor Air Quality Strategies, Option 2: Additional Enhanced IAQ Strategies, Strategy 3: Carbon Dioxide Monitoring, page 704. 2: LEED v4 Reference Guide for Building Design and Construction, Glossary, page 1019.



A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies.
Which of the following credits would be desirable considering the location of the project?

  1. Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance
  2. Indoor Environmental Quality Credit, Quality Views, Exemplary Performance
  3. Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance
  4. Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Answer(s): B

Explanation:

The LEED Platinum certification requires the project to achieve exemplary performance in at least one credit that allows it, as specified in the LEED Reference Guide. One of the credits that meets this criterion is the Indoor Environmental Quality Credit, which focuses on providing healthy and comfortable indoor environments for occupants. The credit has two options: Quality Views and Enhanced Commissioning. Quality Views requires the project to have windows that provide views of natural scenery or water bodies, which can enhance the well-being and satisfaction of occupants. Enhanced Commissioning requires the project to have a comprehensive commissioning plan that ensures all systems are properly installed, tested, and operated before occupancy. Both options can help reduce energy consumption, improve indoor air quality, and create a positive sensory experience for occupants.


Reference:

LEED Reference Guide v4
LEED Platinum Certification - LD Products
LEED Accreditation | LEED Certification & Credentials Overview - GBES



Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

  1. Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting
  2. Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit, Site Assessment
  3. Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Minimum Indoor Environmental Quality Performance
  4. Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Answer(s): A

Explanation:

Selecting a high-reflectance interior paint that meets the SCAQMD Rule 1113 can help contribute towards two credits: Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting. The first credit requires that interior paints and coatings comply with the VOC content limits specified by the SCAQMD Rule 1113 or equivalent standards to reduce indoor air contaminants that are odorous, irritating, and/or harmful to the comfort and well-being of installers and occupants1 The second credit aims to provide high-quality lighting that supports visual acuity and occupant comfort, and that responds to the needs of the space and its users. One of the strategies to achieve this credit is to use light-colored finishes with a minimum reflectance of 0.7 for ceilings, 0.5 for walls, and 0.2 for floors to increase the effectiveness of daylighting and electric lighting systems2


Reference:

1: LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Low-Emitting Materials, page 692. 2:
LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit:
Interior Lighting, page 715.



A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project.
What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

  1. No action is necessary as the PV system is not required to be commissioned
  2. The PV system installer should commission his own installations and share the results with the project owner
  3. The Cx agent for the project must conduct or oversee the Cx of the PV system
  4. The building's mechanical engineer should commission his own installations and share the results with the project owner

Answer(s): C

Explanation:

The correct answer is C, the Cx agent for the project must conduct or oversee the Cx of the PV system. According to the LEED v4 Reference Guide for Building Design and Construction, the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, requires that all energy- related systems, including renewable energy systems such as PV, be commissioned by an independent commissioning agent (CxA) or a qualified member of the project team who reports to the owner. The CxA or the qualified team member must perform or oversee all commissioning activities, including developing a commissioning plan, reviewing design documents and submittals, verifying installation and performance, and preparing a commissioning report12


Reference:

1: LEED v4 Reference Guide for Building Design and Construction, Energy and Atmosphere Prerequisite:
Fundamental Commissioning and Verification, page 562. 2: LEED v4 Reference Guide for Building
Design and Construction, Glossary, page 1020.



Page 17 of 78



Post your Comments and Discuss US Green Building Council LEED-AP-BD-C exam with other Community members:

Anon commented on December 28, 2024
Very helpful
UNITED STATES
upvote

Sachin Kamble commented on December 28, 2024
useful information
Anonymous
upvote

Sachin Kamble commented on December 28, 2024
very interesting and useful onformation
Anonymous
upvote

Bosco Oico commented on December 28, 2024
Yes. i have used this dump for CFE Investigations test yesterday- i found it useful because questions about 60% were closely related and some were exact. The only thing that needs to be improved is the accuracy of the answers. If some one read the CFE manual well, you will notice that some answers as they are answered according to the ACFE standard. So, i encourage anyone using Brain to verify answers, otherwise, its a good source to create confidence and sure pass
UGANDA
upvote

velu commented on December 28, 2024
nice,very useful
Anonymous
upvote

Sai commented on December 28, 2024
I need okta dumps
Anonymous
upvote

Edison Vásquez commented on December 28, 2024
Muy bueno todo muy bien explicado
Anonymous
upvote

TMUNI commented on December 28, 2024
Questions are addressed, but need clarification
UNITED STATES
upvote

TRYY commented on December 28, 2024
Does it work
UNITED STATES
upvote

Ama commented on December 27, 2024
are the comments real
UNITED STATES
upvote

manikanta commented on December 27, 2024
Hi may i know the exam fee and how to apply
UNITED STATES
upvote

Sidney commented on December 27, 2024
Learning a lot
Anonymous
upvote

Dhabya commented on December 27, 2024
Amazing prep
BAHRAIN
upvote

Sidney commented on December 27, 2024
Great questions
Anonymous
upvote

DEE commented on December 27, 2024
nice questions to practice your knowledge and prepare for the exam however I advice everyone to double-check each answer as I've faced many wrong ones
Anonymous
upvote

A commented on December 27, 2024
Are these questions valid?
UNITED STATES
upvote

raj commented on December 27, 2024
Good explaniation for the ans
Anonymous
upvote

Pooja commented on December 27, 2024
Very useful for exam
CHINA
upvote

Sudeep commented on December 27, 2024
Good collection
Anonymous
upvote

Akki1990 commented on December 27, 2024
I am happy !
Anonymous
upvote

Imran commented on December 27, 2024
This is nice stuff
Anonymous
upvote

Akki1990 commented on December 27, 2024
This is really good way to revise all topics , Thank you so much !
Anonymous
upvote

Saf commented on December 27, 2024
Very Useful
Anonymous
upvote

Hekka commented on December 27, 2024
Good set of questions
Anonymous
upvote

Amber commented on December 27, 2024
Passed the exam today. It is going to be a great new year.
UNITED STATES
upvote

Microsoftee commented on December 27, 2024
Thank you so much. Nice material.
Anonymous
upvote

sandy commented on December 27, 2024
good content
Anonymous
upvote

anonymous a commented on December 27, 2024
helpful stuff
Anonymous
upvote

Ravi commented on December 27, 2024
So far so good
INDIA
upvote

Poo commented on December 27, 2024
Useful data
Anonymous
upvote

Cosy commented on December 26, 2024
I am loving it here
Anonymous
upvote

Tanuja Bhusal commented on December 26, 2024
Good Questions
Anonymous
upvote

anonymous commented on December 26, 2024
Just going through the questions for my understanding of Power Bi
UNITED STATES
upvote

laks commented on December 26, 2024
so far seems good
UNITED STATES
upvote