Certified in Production and Inventory Management Questions 256–260 (page: 53)

Updated On: 9-Feb-2026

Operation number
Setup hours, planned and actual
Quantity reported complete at the operation
Quantity reported scrapped at that operation
Due date or lead time remaining
These are the components of ______________ related to each operation.

  1. Shop order master file
  2. Work-center master file
  3. Shop-order detail file
  4. None of these

Answer(s): C



Material Requirements Planning (MRP) is:

  1. The system used to provide available inventory
  2. The system used to avoid missing parts.
  3. A schedule establish for the production agenda
  4. All of the above

Answer(s): B



A schedule (priority plan) that establishes to show the components required at each level of the assembly and based on lead time, calculates the time when these component will be needed called:

  1. Material Requirements Planning
  2. Master Production Schedule
  3. Inventory control Planning
  4. B & C

Answer(s): A



How many types of demand are in Material Requirements planning?

  1. Three
  2. Four
  3. Two
  4. Seven

Answer(s): C



If a company makes wooden tables, the demand for the tables is called

  1. Independent Demand
  2. Dependent Demand
  3. Both A, B
  4. None of the above

Answer(s): A