An RFQ usually provides more detail than RFP in selecting material such as:

  1. delivery date.
  2. mounting option.
  3. make.
  4. color.

Answer(s): D



What should be considered when designing a fiber network?

  1. Use a minimum of OM4 multimode fiber to future proof the design.
  2. Ensure that all connectors are backwards and forward compatible with all applications.
  3. Ensure the fiber strands provided are sufficient in quantity to accommodate all anticipated needs.
  4. Ensure that the single mode and multimode hybrid is recommended.
  5. Design only what you need for today to save money for future upgrades.

Answer(s): D



What is the MAXIMUM length of continuous conduit allowed before a pull point or pull box needs to be installed?

  1. 15.20 m (50 ft)
  2. 22.90 m (75 ft)
  3. 30.50 m (100 ft)
  4. 45.70 m (150 ft)

Answer(s): C



Which of the following is the CORRECT calculation to determine equipment heat load resulting from its power (W) consumption?

  1. W x 1.414
  2. W x 1.732
  3. W x 2.235
  4. W x 3.412

Answer(s): D



A MINIMUM separation distance of 305 mm (12 in) between telecommunication cables and power cables with EMI exceeding 5 kVA is acceptable in which of the following cases?

  1. Power cables are unshielded, while telecommunication cables are enclosed in a grounded metal conduit pathway.
  2. Power cables are unshielded, while telecommunication cables are enclosed in a non-metal conduit pathway.
  3. Power cables are unshielded and enclosed in a grounded metal conduit, while telecommunication cables are enclosed in a grounded metal conduit pathway.

Answer(s): A