Which of the following individuals is typically responsible for funding software process change activities?

  1. Agent
  2. Sponsor
  3. Champion
  4. Target

Answer(s): B



When software reliability measures are used to determine when to stop testing, the best types of test cases to use are those that

  1. push the system beyond its designed operation limits and are likely to make the system fail
  2. exercise unusual and obscure scenarios that may not have been considered in design
  3. exercise system functions in proportion to the frequency they will be used in the released product
  4. exercise the most complicated and the most error-prone portions of the system

Answer(s): C



Which of the following techniques is most useful in narrowing issues and limiting discussion?

  1. Brainstorming
  2. Quality function deployment
  3. Cause and effect analysis
  4. Multivoting

Answer(s): D



The inspection process assigns different roles to each of the inspectors in order to

  1. keep the inspection teams small and manageable
  2. encourage different viewpoints during the inspection process
  3. use fewer organizational resources at any point in time
  4. empower the inspection team members

Answer(s): B



Informal change control is appropriate only

  1. before software configuration items become part of a baseline
  2. until the production baseline is built
  3. when a project has a short duration and limited functionality
  4. until acceptance testing begins

Answer(s): A