Which of the following statements about consumption are correct? (Choose two)
Answer(s): B,D
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
Answer(s): A
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
Answer(s): D
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.What procedure would you recommend to the project team for setting the planning horizon on the system side?
Answer(s): B