Which of the following statements about consumption are correct? (Choose two)

  1. Consumption takes place on the material level between the planned independent requirements and the planned orders.
  2. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
  3. Consumption is restructured with the planning run.
  4. Consumption can take place between order reservations and planned independent requirements, depending on the "Best Material, Great Results".
    strategy.

Answer(s): B,D



When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.



What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

  1. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
  2. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
  3. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
  4. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.

Answer(s): A



When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

  1. Total planning online
  2. Multi-level single-item planning with the "display material list" option
  3. Interactive single-item planning for the delayed assembly
  4. Multi-level single-item planning with the "simulation mode" option

Answer(s): D



Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

  1. A storage location may be assigned to different MRP areas.
  2. An MRP area may include different storage locations.
  3. Make-to-order production is supported by storage location MRP areas.
  4. Subcontracting is supported by MRP areas.

Answer(s): B,D



An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?

  1. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
  2. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
  3. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
  4. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.

Answer(s): B