Scrum effectively limits the risk of unknowingly doing something wrong by

  1. Having multiple checkpoints and a thorough review by senior management at those checkpoints
  2. Using short iterations called Sprints
  3. Having a detailed and extensive risk management plan

Answer(s): B



Which of the following statements about non-core Scrum roles is correct?

  1. Non-core roles are mandatorily required for the Scrum project to be successful.
  2. Non-core roles are supportive roles indirectly responsible for the success or failure of the project.
  3. Non-core roles are involved with the project, but do not have any interest in the project.
  4. Non-core roles have a formal stature on the project team and are continuously involved in the Scrum process.

Answer(s): B


Reference:

https://pdtraining.com.au/assets/pdf/SBOK-Chapter-1-Introduction.pdf



Which of the following meetings is not usually Time-boxed?

  1. Daily Standup.
  2. Scrum of Scrums.
  3. Sprint Planning Meeting.
  4. Sprint Review.

Answer(s): B


Reference:

http://blog.scrumstudy.com/time-boxed-meetings-in-scrum/



A project on developing quality testing equipment for an agro-based industry will start with the Create Deliverables process.
Which of the following are NOT inputs to the current process?

A) Scrum Core Team
B) Acceptance Criteria
C) Impediment log
D) Length of Sprint

  1. A and B
  2. B and D
  3. A and C
  4. B and C

Answer(s): B


Reference:

https://katherinemichel.gitbooks.io/agile-sprint-playbook/project-management/scrum- body-ofknowledge-phases.html



Which of the following statement(s) is/are true with respect to Change in Scrum projects?

A) The Scrum Master suggests changes in consultation with the Scrum Team.
B) The Scrum Master can recommend changes based on Retrospect Sprint Meetings.
C) Changes that are beyond the tolerance level of the Product Owner may need the assistance of the ScrumMaster working with the Product Owner.
D) The Scrum Master finalizes the formal change requests along with the Scrum Team.

  1. Only D
  2. B and D
  3. A and B
  4. Only A

Answer(s): B