Checking ______________ is a two step process. First the order must be scheduled to see when the capacity is needed, and second, the load on work centers must be checked in that period.
Answer(s): A
Projected available balance is calculated in which one of the following ways?
Answer(s): C
A company wants to minimize the cost of manufacture and also be flexible enough to adapt to changing needs. Changes to production schedules can result in the following EXCEPT:
Answer(s): D
Frozen zone, slushy zone and liquid zone are the part of
Answer(s): B