Perform Integrated Change Control is the process of:

  1. Reviewing, approving, and managing all change requests
  2. Facilitating change management, manuals, or automation tools
  3. Comparing actual results with planned results in order to expand or change a project
  4. Documenting changes according to the change control system by the change control board

Answer(s): A



When painting a bedroom, preparing the walls can be done while the paint is being chosen. This is an example of a:

  1. lead
  2. lag
  3. mandatory dependency
  4. internal dependency

Answer(s): A



Which action is included in the Control Costs process?

  1. Identify how the project costs will be planned, structured, and controlled
  2. Determine policies, objectives, and responsibilities to satisfy stakeholder needs
  3. Develop an approximation of the monetary resources needed to complete project activities
  4. Monitor cost performance to isolate and understand variances from the approved cost baseline

Answer(s): D



What is the risk rating if the probability of occurrence is 0.30 and the impact if it does occur is moderate (0.20)?

  1. 0.03
  2. 0.06
  3. 0.10
  4. 0.50

Answer(s): B