One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where things are when needed. This 5S tool is called ____________.

  1. Standardizing
  2. Scheduling
  3. Sustaining
  4. Straightening

Answer(s): D



The length of wooden beams being sawed is measured by a line operator. Which is least likely to be influenced by the instrument?

  1. Calibration of the instrument
  2. Actual temperature of the liquid
  3. Recording the measurement
  4. Reading of the instrument

Answer(s): C



A Belt gathered the following defect data for a polyurethane production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:

Data: Trimming 37
Forming 61
Packaging 29
Sealing 5

  1. Trimming, Packaging, Sealing, Forming
  2. Packaging, Trimming, Sealing, Forming
  3. Sealing, Forming, Trimming, Packaging
  4. Forming, Sealing, Trimming, Packaging

Answer(s): D



______________ represents all the variation that one can expect to experience from the output of the subject process.

  1. A Standard Deviation
  2. Data range
  3. Long-term Data
  4. The Mode

Answer(s): C



In an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs is called the Value Chain.

  1. True
  2. False

Answer(s): A



Viewing page 5 of 31
Viewing questions 21 - 25 out of 150 questions



Post your Comments and Discuss PEOPLECERT IASSC Lean Six Sigma - Yellow Belt exam prep with other Community members:

Join the IASSC Lean Six Sigma - Yellow Belt Discussion