Which of the following is NOT one of the three levels of plan recommended by PRINCE2?

  1. Stage
  2. Team
  3. Benefits Review
  4. Project

Answer(s): C



The period of time for which it is possible to accurately plan in detail is known as?

  1. The predicting period
  2. The planning horizon
  3. The stable schedule
  4. The panorama plan

Answer(s): B



Which of the following shows the scope of a plan?

  1. The full content of a product checklist
  2. The related product breakdown structure
  3. The composition of a Project Product Description
  4. All of the project's Configuration Item Records

Answer(s): B



Which product does the Project Board use as a base against which to monitor project progress on a stage by stage basis?

  1. Stage Plan
  2. Project Plan
  3. Programme Plan
  4. Benefits Review Plan

Answer(s): B