During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

  1. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in- house production.
  2. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
  3. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
  4. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.

Answer(s): A,D



In what sequence are the steps of material requirements planning performed in SAP ECC?

  1. 1. Net requirements calculation
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  2. 1. Calculation of safety stock
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  3. 1. Availability check
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  4. 1. Net requirements calculation
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type

Answer(s): A



The availability check during production order creation should use a different scope of check than during order release.
How can you fulfill this requirement?

  1. Maintain appropriate checking rules in checking control for order creation and order release.
  2. Maintain appropriate availability checking rules in the order type-dependent parameters.
  3. Maintain an appropriate availability checking group in the material master.
  4. Maintain appropriate availability checking rules in the production scheduling profile.

Answer(s): A



From what point can you no longer use the Read PP master data in the production order?

  1. After printing the order papers.
  2. After the first posting of goods movements or confirmation.
  3. From the release of the production order.
  4. After assigning the confirmed quantity of a material component due to carrying out a material availability check.

Answer(s): B