Free SAP C_TSCM42_67 Exam Braindumps (page: 4)

Which of the following statements best defines SAP ERP?

  1. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
  2. SAP ERP is an application that a company can use to manage its business processes efficiently.
  3. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
  4. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.

Answer(s): B



Which function is supported by production orders?

  1. Automatic selection of a work center at order release
  2. Automatic creation of transfer orders at order release
  3. Automatic reading of PP master data at order release
  4. Automatic printing of order documents at order creation

Answer(s): B



A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?

  1. Execution Steps (XSteps) and process messages
  2. SAP Business Intelligence (BI)
  3. Plant data collection (PP-PDC) interface
  4. SAP Application Link Enabling (ALE)

Answer(s): A



In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?

  1. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
  2. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
  3. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
  4. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.

Answer(s): C



Viewing page 4 of 27
Viewing questions 13 - 16 out of 106 questions



Post your Comments and Discuss SAP C_TSCM42_67 exam prep with other Community members:

C_TSCM42_67 Exam Discussions & Posts