DRAG DROP (Drag and Drop is not supported)An engineer deploys a custom guest shell rootfs onto multiple switches.Drag and drop the steps from the left into the correct order on the right.Select and Place:
Answer(s): A
An engineer changed a configuration and must perform a rollback.Which statement applies to a Cisco Nexus 5600 Series Switch?
Guidelines and Limitations -Rollback has the following configuration guidelines and limitations:* You can create up to ten checkpoint copies.* You cannot apply the checkpoint file of one switch into another switch.* Your checkpoint file names must be 75 characters or less.* You cannot start a checkpoint filename with the word system* When FCoE is enabled, the checkpoint and configuration rollback functionality are disabled.
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5000/sw/system_management/503_n1_1/ cisco_n5k_system_mgmt_cg_rel_503_n1_1_chapter11.pdf
Which statement describes the rolling EPLD upgrade on a Cisco MDS 9000 Series Switch?
Answer(s): B
When you upgrade or downgrade the EPLDs, observe the following guidelines and limitations:* You can upgrade each module only when it is online. The EPLD upgrade is only disruptive to the module being upgraded.* If you interrupt an EPLD upgrade or downgrade, the module must be upgraded again.* In Cisco MDS 9000 Director Switches, EPLD upgrade or downgrade can only be executed from the active supervisor module. To upgrade the supervisorEPLDs nondisruptively, upgrade the standby supervisor and then switchover. After the new standby supervisor is online, its EPLDs can be upgraded.* In Cisco MDS 9000 Series Fabric Switches, be sure to specify 1 as the module number. The switch must be power cycled for the EPLDs to start running the new code.
https://www.cisco.com/c/en/us/td/docs/dcn/mds9000/sw/9x/release-notes/epld/epld-rn-922.html
Which command reduces the amount of time it takes to complete the ISSU on a Cisco Nexus 7000 Series Switch that has dual supervisor modules and two I/O modules?
Starting with Cisco NX-OS Release 5.2(1), multiple linecards can be simultaneously upgraded, and the infrastructure support is available. This decreases theISSU time when compared with an ISSU upgrade that is done serially (one card at a time).To start a parallel upgrade, use the following command: install all kickstart image system image parallel.
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus7000/sw/upgrade/guide/ cisco_nexus7000_software_upgrade_and_downgrade_guide_8x.html
Which two statements describe the process of performing an EPLD upgrade on a Cisco MDS 9000 Series Switch? (Choose two.)
Answer(s): B,E
Post your Comments and Discuss Cisco 350-601 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the 350-601 content, but please register or login to continue.