An engineer must perform an initial configuration of VXLAN Tunnel End-Point functionality on the Cisco Nexus 9000 Series platform. All the necessary features are already enabled on the switch. Which configuration set must be used to accomplish this goal?
Answer(s): D
An engineer must perform a software upgrade on a production Cisco Nexus 7000 Series Switch. Before the upgrade activity, the requirement is for all ports to be shut down and routing protocols to terminate gracefully. Which feature must be used to meet these requirements?
Answer(s): C
DRAG DROP (Drag and Drop is not supported)Refer to the exhibit. An engineer must monitor the Ethernet port and the corresponding VLAN traffic for the hyper4 device. The SW3 device is a Cisco Nexus 7000 Series Switch. Drag and drop the code snippets from the right into the boxes in the configuration to meet these requirements.
Answer(s): A
DRAG DROP (Drag and Drop is not supported)Drag and drop the network assurance concepts from the left onto the corresponding benefits on the right.
Post your Comments and Discuss Cisco® 350-601 exam with other Community members:
Finn Commented on May 04, 2023 I appreciated the mix of multiple-choice and short answer questions. I passed my exam this morning. IRLAND
Finn Commented on May 04, 2023 i appreciated the mix of multiple-choice and short answer questions. i passed my exam this morning. IRLAND
Jack Commented on June 02, 2020 This crisis [the COVID-19 pandemic] has demonstrated the need to be digital-first, agile and could-prepared. Therefore, I have started to get as many could based certificates as I can. With the help of these brain dumps I think it is possible. UNITED KINGDOM
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the 350-601 content, but please register or login to continue.