Which KPI can assist the project manager in the analysis of a Gross Margin deviation?

  1. Project asset rotation days (PARD).
  2. Rollout accuracy (RA).
  3. Project Cost Adherence (PCA).
  4. Telecom Implementation Lead Time (TILT).

Answer(s): C



Change requests should not occur due to:

  1. an external event such as a change in government regulation.
  2. an error or omission in defining the scope of the product.
  3. a software failure that prevents timely site integration.
  4. change in GIC structure.

Answer(s): D



The estimated value of the work actually accomplished is:

  1. earned value (EV).
  2. planned value (PV).
  3. actual cost (AC).
  4. cost variance (CV).

Answer(s): A



Which of the following inputs are used for Resource Planning?

  1. Scope statement.
  2. Resource pool description.
  3. Historical information of resource utilization.
  4. All of the other options.

Answer(s): D



What costs are included in NCC reporting based on current guidelines?

  1. All Nokia business line costs.
  2. GS and MBB costs.
  3. GS costs.
  4. Resources related costs.

Answer(s): C